Harding University's Mechanical Engineering Lab
Follow along as Harding's new Mechanical Engineering Lab is created within the Ulrey building.
Friday, May 29, 2009
Almost Complete!
Plastic injection molding machine.
Metal fabricating equipment in place.
Senior design projects will keep this room buzzing when open.
Almost complete.
Tuesday, May 5, 2009
New outside entrance.
Tuesday, April 14, 2009
Let the painting begin!
Ceilings first.
Tuesday, April 7, 2009
April 7, 2009
Machining equipment is protected before painting the ceiling.
Insulation for a warm and cool atmosphere.
Attic for IT equipment.
More fabricating equipment.
Thursday, April 2, 2009
April 2, 2009
Installing HVAC
The walls are going up.
Future Office
Flying sparks.
Tuesday, March 24, 2009
March 24, 2009
Starting to frame the walls.
Plumbing is complete.
Renovation begins! March 17, 2009
A look at the 6000 square feet of floor space.
.
Prototyping equipment, donated by Delphi Corporation, waiting for a new home.
Trench for plumbing.
Look from the other direction.
Epoxy floor covering test patch.